| Handling, Storage, Fabrication | |||
| and Structural Engineering | |||
| William Road, Devizes, SN10 3EW Tel: 01380 723040 | ||



| Stornoway water treatment plant | ||
| T H White’s installation and fabrication employees certainly manage to get around. In mid-November our Alnwick twins (Kevin and Karl) braved Force 9 gales travelling across to the Outer Hebrides to install a walkway and two staircases at a water treatment plant in Stornoway. The structure, fabricated by T H White in Devizes, was the latest in a series of water treatment installations carried out on behalf of Chippenham-based Huber Technology. This was no simple journey. The twins drove 1,400 miles, had to contend with two |
||
| cancelled ferries (because of weather and an engineering shutdown), and returned by criss-crossing from Stornoway to Tarbert, ending up on the Isle of Skye. The steel work was transported separately from Devizes by low-loader. “Brilliant scenery and a job well-done,” said Kevin on his return, “but I would not recommend those ferries in a Force 9 gale!” Two similar contracts have been completed in October and November for Huber Technology in Ireland and Newcastle-upon-Tyne. |
||